Tuesday, May 13, 2014

Building Block Model


ACCA P5 Advance Performance Management



Fitzgerald and Moon’s building block model is performance measurement framework based on dimension, standards and measures.
Dimensions are the goals i.e CSF so suitable measure must be developed to measure each of dimensions. Dimensions is two fold:
Downstream Results
Components under results are: competitiveness, financial performance
Upstream Determinants
Components under determinants are: quality of service, flexibility, resource utilization and innovation.
Standards
are set of KPI’s represented by AEO where A means Achievability, E means Equity/Fairness and O means Ownership.
Ø  Achievability – links to maximum capacity utilization, challenging enough – not overestimation
Ø  Equity – all participants should be fairly measured by providing equal challenging task
Ø  Ownership – accept participation in setting own measurement target
Measures
Ø  Clear – Reward should be clearly defined i.e. the rate of reward and achievement of performance both should be measurable
Ø  Controllable – should avoid linking reward to areas of performance which cannot be controlled e.g. linking to idle performance which is only achievable only in very short run OR should not be linked to operation where manager does not have power to control
Ø  Motivational – reward should motivate employees to achieve objectives – should be mix of both monetary and not-monetary reward

Dimension
Type of measure - CSF
Standards - KPI
Measures - Rewards
Competitiveness
Market position
Relative market share
Link senior management bonus to market expansion measures
Financial performance
Profitability, gearing
ROCI, ROE, Debt/Equity ratio
Link management profit related bonus
Quality of service
Product standardisation
Reliability, improved performance
% commission for repair engineers from fee or warranty paid
Flexibility
Delivery, Production
Delivery speed, Production cycle
Points for each on time delivery – leading to bonus
Resource utilization
Waste reduction
Productivity
Link reward if waste minimization target is met
Innovation
Learning, creativity, sustainability
No of new product/ process, Earning from new product
Link pay to success of new product over life of product

1 comment: